How to Use PVsyst Software for Designing a Solar Power Plant

Step-by-step guide to using PVsyst for designing solar power plants with detailed technical insights.


Designing a solar power plant requires precise calculations, simulations, and analyses to ensure optimal performance and efficiency. PVsyst, a widely-used software, provides comprehensive tools for modeling and simulating photovoltaic (PV) systems. This step-by-step tutorial will guide you through using PVsyst to design a solar power plant, helping you understand each phase of the process with detailed technical descriptions.

Step 1: Installation and Setup

  1. Download and Install PVsyst:

    • Visit the PVsyst website and download the appropriate version for your operating system (Windows is typically supported).

    • Follow the installation wizard and select the default installation path.

  2. License Activation:

    • Activate the licensed version by entering the credentials provided at purchase. For testing or learning purposes, a demo version with limited functionality is available.

  3. Initial Configuration:

    • Launch PVsyst and navigate to the "Options" menu.

    • Set units of measurement (e.g., kilowatts peak (kWp) for power, meters for distances).

    • Configure the weather data source to align with your project location, such as importing typical meteorological year (TMY) data.

Step 2: Create a New Project

  1. Start a New Project:

    • From the main menu, select "File" > "New Project."

    • Enter a project name (e.g., "Texas Solar Project") and define the file path for saving project data.

  2. Set Project Site:

    • In the "Geographic Site" section, input the exact location of the project using latitude and longitude coordinates. For example, for a site in Austin, Texas, you could use:

      • Latitude: 30.2672° N

      • Longitude: 97.7431° W

    • If available, use the built-in geographic map to pinpoint the site location.

  3. Import Weather Data:

    • Access the "Meteo" section to import solar irradiance and meteorological data.

    • Use trusted data sources like:

      • National Renewable Energy Laboratory (NREL) for TMY3 data.

      • PVGIS for global data sets.

    • Verify that the dataset includes Global Horizontal Irradiance (GHI), Direct Normal Irradiance (DNI), diffuse irradiance, ambient temperature, and wind speed.

  4. Define System Type:

    • Specify whether the system is grid-connected or standalone.

    • For this example, choose "Grid-connected" with a nominal capacity of 5 MW.

Step 3: Load Meteorological Data

  1. Import Weather Data:

    • Select "Meteo" and load the relevant weather data file.

    • Ensure the data includes:

      • Monthly average irradiance values.

      • Ambient temperature ranges.

      • Typical wind speed values.

  2. Analyze Weather Data:

    • Use the "Meteo Tables and Graphs" feature to examine trends and verify accuracy.

    • Adjust any irregularities by applying correction factors where necessary.

Step 4: Define System Components

  1. PV Modules:

    • Choose a module type from the extensive PVsyst database or create a custom module.

    • For this example, select a high-efficiency monocrystalline module:

      • Model: SunPower SPR-X22-370

      • Key specifications:

        • Peak Power (â„“Pmax): 370 W

        • Module Efficiency: 22.1%

        • Temperature Coefficient: -0.35%/°C

  2. Inverters:

    • Select an inverter suitable for the chosen module and system size. For a 5 MW system in Texas:

      • Model: SMA Sunny Central 5000-US

      • Key specifications:

        • Maximum Input Voltage: 1000 V

        • MPPT Efficiency: 99.5%

  3. System Losses:

    • Configure losses in the "System" section:

      • Soiling Loss: 3% (typical for the USA)

      • Thermal Loss: Dynamic based on local climate.

      • Wiring Loss: 1.5% for high-efficiency cabling.

Step 5: Design System Layout

  1. Define Orientation:

    • Set the tilt angle based on site latitude (optimal tilt for Austin, Texas: 30°).

    • Define azimuth as 180° (true south) for maximum energy capture.

  2. Array Configuration:

    • For a 5 MW system:

      • Use 13,514 modules (370 W each).

      • Strings: 22 modules in series, with 615 strings in parallel.

  3. Shading Analysis:

    • Navigate to the "Near Shading" tool and import 3D objects representing obstacles (e.g., nearby buildings, trees).

    • Simulate shading effects and refine layout to minimize shadowing losses.

Step 6: Run Simulations

  1. Preliminary Simulation:

    • Perform a quick simulation to check for errors in configuration and ensure compatibility of all components.

  2. Detailed Simulation:

    • Run a detailed analysis by clicking "Simulation" > "Run Simulation."

    • Review the following outputs:

      • Specific Yield: Energy generated per kWp installed.

      • Performance Ratio (PR): Indicator of system efficiency, typically >75%.

      • Annual Energy Output: Estimated in MWh.

  3. Iterative Optimization:

    • Adjust array spacing, tilt angle, or component specifications to optimize energy output.

    • Rerun simulations to evaluate changes.

Step 7: Analyze Results

  1. Performance Report:

    • Generate a detailed report including:

      • Monthly energy yield.

      • System losses (e.g., soiling, shading).

      • PR and LCOE values.

  2. Graphs and Insights:

    • Analyze daily and seasonal performance graphs.

      • Example: Energy output peaks in summer months due to higher irradiance.

  3. Economic Analysis:

    • Use PVsyst’s financial tools to calculate Levelized Cost of Energy (LCOE) and payback period.

Step 8: Export and Document Results

  1. Export Data:

    • Save simulation results in PDF or Excel formats for easy sharing.

  2. Create a Project Report:

    • Compile the following:

      • Energy yield estimates.

      • Shading analysis visuals.

      • Financial metrics.

Example Project: 5 MW Solar Power Plant

  1. Setup:

    • Location: Austin, Texas, United States

    • Modules: SunPower SPR-X22-370 (370 Wp, 22.1% efficiency)

    • Inverter: SMA Sunny Central 5000-US

  2. Steps:

    • Imported weather data from NREL’s TMY3 database.

    • Configured system with a 30° tilt and true south orientation.

    • Modeled shading from a nearby warehouse.

  3. Results:

    • Annual Energy Output: 8,400 MWh

    • Performance Ratio (PR): 78%

    • Estimated LCOE: $0.045/kWh

By following this comprehensive tutorial, you can effectively design solar power plants using PVsyst. Accurate input and iterative improvements are critical to achieving optimal performance. Experiment with your design to create efficient and sustainable energy solutions for various locations in the United States and beyond.