Design Considerations for Grid-Tied Rooftop Solar PV Systems

Grid-tied rooftop solar design guide with sizing, shading analysis, calculations, and Phoenix example.


Designing a grid-tied rooftop solar PV system is a multi-disciplinary task involving electrical design, structural integrity, solar resource evaluation, shading analysis, and adherence to local codes. This guide provides an in-depth look into the essential design aspects of rooftop solar PV systems with detailed calculations, examples, and practical insights.

📍 Example Location Used: Phoenix, Arizona – one of the sunniest cities in the U.S.


1. Introduction to Grid-Tied Rooftop PV Systems

A grid-tied rooftop solar PV system is connected to the utility grid and is designed to offset on-site energy consumption. When solar production exceeds usage, the surplus electricity is exported to the grid (net metering). Key components include:

  • Solar PV Modules

  • Grid-Tied Inverter

  • Mounting Structures

  • DC/AC Cabling and Protection Devices

  • Bi-directional Energy Meter

  • Monitoring System


2. Site and Roof Assessment

2.1 Orientation and Tilt

  • Orientation (Azimuth): Panels should ideally face true south in the U.S. (azimuth = 180°).

  • Tilt Angle: For maximum yearly output, tilt = latitude ± 10°.

🔎 Example – Phoenix, Arizona:

  • Latitude ≈ 33.5°

  • Recommended tilt angle ≈ 30–35°

This tilt provides an optimal balance between summer and winter production.


2.2 Structural Load Assessment

Verify that the roof can support:

  • PV modules (≈15 kg/m²)

  • Mounting structures

  • Wind uplift forces (as per ASCE 7 standards)

Consult a structural engineer to check:

  • Dead load capacity

  • Wind load zones

  • Anchoring feasibility


3. Solar Resource Assessment

Use solar irradiance data tools such as:

  • NREL’s PVWatts

  • NSRDB (National Solar Radiation Database)

  • SolarGIS, Meteonorm

🔎 Phoenix, AZ Data:

  • GHI (Global Horizontal Irradiance): ≈ 2150 kWh/m²/year

  • POA (Plane of Array) Irradiance at 35° tilt: ≈ 2350–2400 kWh/m²/year

Phoenix is one of the most solar-rich cities in the U.S., making it ideal for rooftop solar.


4. System Sizing

4.1 Load Estimation

Estimate your home's daily energy consumption:

Daily Load (kWh)=i=1nPower (kW)×Usage Time (hrs)\text{Daily Load (kWh)} = \sum_{i=1}^{n} \text{Power (kW)} \times \text{Usage Time (hrs)}

🔹 Assume:

  • Daily consumption = 15 kWh


4.2 PV Capacity Calculation

Required PV Capacity (kW)=Daily LoadAverage Peak Sun Hours (h/day)\text{Required PV Capacity (kW)} = \frac{\text{Daily Load}}{\text{Average Peak Sun Hours (h/day)}}

🔹 Phoenix avg. peak sun hours = 6.0

PV Size=156=2.5 kW\text{PV Size} = \frac{15}{6} = 2.5 \text{ kW}

Add buffer for losses (20%):

Adjusted Size=2.5×1.2=3.0 kW\text{Adjusted Size} = 2.5 \times 1.2 = 3.0 \text{ kW}

Recommended PV capacity: 3 kW


5. PV Module Selection and Configuration

5.1 Example Module Specs

  • Rating: 400 Wp

  • Vmp = 38 V, Voc = 45 V

  • Imp = 10.5 A, Isc = 11 A

5.2 String Design

For 10 modules (400 W × 10 = 4 kW):

Vmp,string=10×38=380 VV_{mp, string} = 10 \times 38 = 380 \text{ V} Voc,string=10×45=450 VV_{oc, string} = 10 \times 45 = 450 \text{ V}

Assume inverter max DC input = 600 V. The string is within limits.


6. Inverter Selection

Key considerations:

  • Inverter capacity ≥ PV array size

  • MPPT range must match string voltage

  • UL 1741 certified

  • Anti-islanding, rapid shutdown features

🔹 Example:

  • PV array = 3.2 kW

  • Use a 3 kW or 3.3 kW inverter with MPPT range: 300–500 V


7. Shading Analysis

Shading can reduce output significantly due to series wiring of modules. Analyze:

  • Permanent obstructions (chimneys, trees, HVAC units)

  • Seasonal shadow paths

Tools:

  • PVsyst, Helioscope, Solar Pathfinder, SketchUp + Shadow Plugin

Shading Calculation Example

A 1.5 m tall object located 2.5 m away:

Shadow Length=1.5tan(45)=1.5 m\text{Shadow Length} = \frac{1.5}{\tan(45^\circ)} = 1.5 \text{ m}

Ensure modules are placed outside of this shadow length during solar window (9 AM – 3 PM).

Mitigation Strategies:

  • Optimize array layout

  • Use microinverters or DC optimizers (e.g., Enphase, SolarEdge)

  • Employ bypass diodes


8. Performance Estimation

8.1 Performance Ratio (PR)

PR=Actual Output (kWh)Irradiance (kWh/m²)×Module Area (m²)×Module Efficiency×100%PR = \frac{\text{Actual Output (kWh)}}{\text{Irradiance (kWh/m²)} \times \text{Module Area (m²)} \times \text{Module Efficiency}} \times 100\%

Typical PR range: 75–85%


8.2 Capacity Utilization Factor (CUF)

CUF=Annual OutputInstalled Capacity×8760×100%CUF = \frac{\text{Annual Output}}{\text{Installed Capacity} \times 8760} \times 100\%

🔹 If a 3 kW system generates 5,500 kWh/year:

CUF=55003×8760×10020.9%CUF = \frac{5500}{3 \times 8760} \times 100 \approx 20.9\%

9. Electrical Design and Protection

DC Side

  • DC isolator

  • SPD (Surge Protection Device)

  • Fuses

  • MC4 connectors

  • 4–6 mm² UV-resistant DC cable

AC Side

  • MCB or breaker

  • RCD/GFCI protection

  • AC SPD

  • AC isolator

Earthing

  • Equipment grounding

  • Array frame grounding

  • Lightning protection (if required)


10. Monitoring System

Most grid-tied inverters come with:

  • Wi-Fi or Ethernet communication

  • Mobile app/web portal

  • Monitoring parameters:

    • Daily/monthly generation

    • Inverter status

    • Fault alerts

    • PR and CUF reports


FAQs

Q1. What happens during a grid outage?

The inverter shuts down for safety (anti-islanding). Use a hybrid inverter and battery storage for backup.


Q2. Is it necessary to install a tilt structure in Phoenix?

Yes, for flat roofs. Tilt optimizes exposure and improves self-cleaning via rain.


Q3. How often should panels be cleaned?

In Phoenix’s dusty environment:

  • Residential: Every 3–6 months

  • Commercial: Monthly (or use automated cleaning systems)


Q4. How long does a rooftop solar system last?

  • PV modules: 25–30 years (with 80% output warranty)

  • Inverters: 10–12 years

  • Mounting Structures: 20+ years (galvanized/aluminum)


Q5. Can I oversize the PV system beyond inverter rating?

Yes. Up to 120–130% of inverter rating is acceptable depending on model and standards (e.g., NEC 690.8).


Conclusion

Designing an efficient and reliable grid-tied rooftop solar system requires attention to electrical configuration, environmental conditions, shading, and performance metrics. Using Phoenix, Arizona as an example, we showed how high solar irradiance, correct sizing, and proper shading analysis can result in a well-performing rooftop PV system.

With precise planning and quality components, homeowners and businesses can benefit from sustainable energy and long-term savings.



Prasun Barua is an Engineer (Electrical & Electronic) and Member of the European Energy Centre (EEC). His first published book Green Planet is all about green technologies and science. His other …